CPC30220 Certificate III in Carpentry
Duration
Total duration: 104 Weeks [8 term]
Qualification Description
This is a trade qualification for carpenters in residential and commercial workplaces. It includes setting out, manufacturing, constructing, assembling, installing and repairing products made using timber and non-timber materials.
Occupational titles may include:
- Carpenter – Commercial
- Carpenter – Formwork
- Carpenter – Residential
Delivering unit of competency
This qualification has 34 units of competency, comprising of 27 core & 7 elective units.
| Code | Title |
| CPCCCA2002* | Use carpentry tools and equipment |
| CPCCCA2011* | Handle carpentry materials |
| CPCCCA3001* | Carry out general demolition of minor building structures |
| CPCCCA3002* | Carry out setting out |
| CPCCCA3003* | Install flooring systems |
| CPCCCA3004* | Construct and erect wall frames |
| CPCCCA3005* | Construct ceiling frames |
| CPCCCA3006* | Erect roof trusses |
| CPCCCA3007* | Construct pitched roofs |
| CPCCCA3008* | Construct eaves |
| CPCCCA3010* | Install windows and doors |
| CPCCCA3016* | Construct, assemble and install timber external stairs |
| CPCCCA3017* | Install exterior cladding |
| CPCCCA3024* | Install lining, panelling and moulding |
| CPCCCA3025* | Read and interpret plans, specifications and drawings for carpentry work |
| CPCCCA3028* | Erect and dismantle formwork for footings and slabs on ground |
| CPCCCM2006 | Apply basic levelling procedures |
| CPCCCM2008* | Erect and dismantle restricted height scaffolding |
| CPCCCM2012* | Work safely at heights |
| CPCCCO2013* | Carry out concreting to simple forms |
| CPCCOM1012* | Work effectively and sustainably in the construction industry |
| CPCCOM1014* | Conduct workplace communication |
| CPCCOM1015 | Carry out measurements and calculations |
| CPCCOM3001 | Perform construction calculations to determine carpentry material requirements |
| CPCCOM3006 | Carry out levelling operations |
| CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry |
| CPCWHS3001 | Identify construction work hazards and select risk control strategies |
| CPCCCA3022* | Install curtain walling |
| CPCCJN3003* | Manufacture components for doors, windows and frames |
| CPCCCA3014* | Construct and install bulkheads |
| CPCCCA3009* | Construct advanced roofs |
| CPCCCM3005 | Calculate costs of construction work |
| CPCCCA3026* | Assemble partitions |
| CPCCCA3018* | Construct, erect and dismantle formwork for stairs and ramps |
